Geko Energy

Our work

Real installs. Real proof — on request.

We'd rather show you the certificates, the data and the references from real customers than dress up stock photos as a portfolio. Published case studies are in production. Until they're live, here's the work we do and how to verify it.

MCS
Certified installer
10-yr
Workmanship warranty
25-yr
Product warranty
0%
VAT until April 2027

The work we do

Three install types — one in-house team.

No subcontracting. Every job designed, installed and signed off by Geko's own MCS-certified engineers.

Family homes — 4–10kW

Most of our work. Roof-integrated or on-roof, paired with 5–13.5kWh battery, EV charger and live monitoring. Designed around your tariff and household usage pattern.

Farms & rural properties — 10–30kW

Working farms, barn conversions and off-grid-ready hybrids. Phased installs to avoid disrupting livestock or harvest. Optional off-grid backup for power-cut areas.

Commercial — 30–500kW

Warehouses, light industrial, agricultural buildings. We handle DNO, planning, structural sign-off and commissioning in-house. ROI modelling included with every commercial quote.

Proof, not pitch

How to verify us before you sign anything.

Solar is a 25-year decision. We'd rather hand you three ways to check our work than show you a brochure.

MCS paperwork on every job

Every install ships with the MCS certificate, DNO confirmation and updated EPC. Redacted copies of recent installs available on request.

Ask the team

Speak to recent customers

Recent customers have agreed to take direct reference calls. Mention it on your discovery call and we'll connect you with someone whose install matches yours.

Ask the team

First case study live

Pete & Sarah's install — 16 panels, a 12kWh Fox battery, installed in a single day. From over £3,000/year to £23/month. Read the full breakdown.

Read the case study
Free consultation

Let's find the right system for your home.

Book a free video consultation. We'll talk through your needs, your property, and your options — no obligation, no pressure.

0% VAT on installs commissioned before 31 March 2027